国产一级一级一级成人毛片,欧美人与性动交α欧美精品,91精品福利在线

In-line leveling machine

1. On-line internal weld leveling machine stainless steel in-line leveling (also known as internal weld leveling): stainless steel welding into steel pipe and other circular workpieces will appear uneven, uneven inside and outside the weld, leveling is the use of special internal weld leveling equipment in the weld pressure multi-pass rolling, and ultimately the welding leveling, so that The internal and external weld surface is smooth without stratification. It is suitable for oil, chemical, nuclear power, boilers, food, medicine and other industries instead of stainless steel seamless pipes. 2. Automated production process: internal leveling.

1. In-line weld leveling machine

Stainless steel on-line  internal leveling (also known as internal weld leveling): When stainless  steel is welded into circular workpieces such as steel pipes, there  will be unevenness and irregularity inside and outside the weld.  Leveling is to use special internal seam leveling equipment to pressure  multi-pass rolling on the weld, and eventually leveling the welding, so  that the surface of the internal and external welds will not appear  smoothly. Layered. It is suitable for oil, chemical, nuclear power,  boilers, food, medicine and other industries instead of stainless steel  seamless pipes.


2, automated production process:

The  internal leveling stainless steel machinery consists of internal and  external weld leveling stand, hydraulic pneumatic system, automatic  electro-hydraulic-pneumatic control system with PLC control, and also  includes die and rolling fluid circulation equipment. After rolling with  horizontal rollers, the residual height of stainless steel welded pipe  with internal and external weld seam is removed, the cross section of  welded pipe becomes a horizontal ellipse, and the mandrel is stuck in  the welded pipe to follow the welded pipe; after rolling with vertical  rollers, the cross section of welded pipe becomes a positive circle.  When the mandrel and welded pipe are separated from the frame, the  cylinder is pulled back to the appropriate position, and then the second  one is carried out. Rolling cycle


3, product characteristics:

The  internal and external welding seam leveling device of stainless steel  welded pipe is a reciprocating automatic rolling device with built-in  mandrel and roll for rolling stainless steel welded pipe. By controlling  the rolling strength and pass, the requirements of leveling the  internal and external welding seam, completely removing the excess  height of the internal and external welding seam and leveling with the  base metal can be achieved. Popularly speaking, it is to realize  seamless welding of stainless steel welded pipe.


4. Product parameters:

Model

pipe diameter

wall thickness

speed

power

metN40

O.D.1251mm

0.5-2.0mm

0-6m/min

7.5KW

metN 50

O.D.3276mm

0.5-3.0mm

0-6m/min

11KW

metN 60

O.D.50114mm

0.5-3.5mm

0-4m/min

11KW

metN 80

O.D.89168mm

0.5-4.0mm

0-3m/min

15KW

metN 100

O.D.100219mm

0.5-6.0mm

0-2m/min

15KW

metN 120

O.D.150273mm

0.5-8.0mm

0-1.5m/min

18.5KW

Operating procedures


1. Purpose:


1.1  in order to better ensure the normal operation of the equipment,  effective guarantee of smooth production, meet product requirements.


1.2 effective maintenance of equipment.


1.3 write reasonable operation instructions to ensure the production plan and product quality requirements are reached.


2, scope of use:


Welded pipe production: pipe making department.


3, rules:


3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.


3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas and electricity, whether the grinding wheel, saw blade and  cutting table are normal.


4, boot:


4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.


4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.


4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.


4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.


4.4 Let the  motor run empty for 2-3 minutes before going to work every morning. The  transmission gears are equal to 0. When driving, the operator is not  allowed to leave the machine tool and do other irrelevant things.


4.5  it is strictly prohibited to wear gloves to boot, long sleeved clothes  must wear hand sleeves, and long hair must wear a hat.


4.6 do not wipe the rotating parts when starting.


4.7 correctly adjust the mold, not vigorously under pressure, in place.


4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.


4.9 In the process of  pipe-making, the cutting strip must be consented by the workshop  director, stored in the belt-laying area, and recorded in detail with  the sling operator on the Production Process Card. It must not be  discarded at will.


4.10 If abnormal phenomena are found  in operation, such as smoke, burning odor, sudden fuse burning, sudden  extinguishment of indicator lights and timely switching off the power  switch to be checked out, then turn on operation after troubleshooting.


4.11  the product's length is checked regularly, not more than 6.01 meters,  not less than 6 meters. Strictly controlled between 4mm. The pipe on the  unloading pipe rack should not exceed 95% of the total capacity, so  that the flat mouth personnel should be lifted in time, otherwise the  operator will be responsible for the damage.


5, downtime:


5.1 shut down the power while waiting for the welder to stop.


5.2 clean the gauges carefully with clean cotton cloth, place them in the box and put them into the toolbox.


5.3 clean up all the fixtures and fixtures on the machine tools and classify them into the toolbox.


6, on-site finishing or handover.


6.1 clean the surrounding 1 meters of equipment within 20 minutes before each shift, including the corresponding window sill.


6.2 clean the floor and the bottom of the machine tool and wipe the whole equipment clean.

6.3 pull the scrap stainless steel pipe out of the designated location.


6.4  At the end of work, the specifications and the number of branches  produced by oneself, the number of perforated pipes (branches) and the  waste (kg) are well registered on the production record card, and the  statistics are made by the workshop quality inspection, and the  "Production Process Card" is filled in, so that the operation of the  machine platform of successors and matters needing attention are handed  over. Clean the machine and the regional health before leaving.


  • <button id="ml04a"></button>
    <li id="ml04a"></li>

    1. <span id="ml04a"></span>
      <rt id="ml04a"></rt>

        <label id="ml04a"></label>
          主站蜘蛛池模板: 句容市| 滕州市| 城口县| 澳门| 泸溪县| 海原县| 曲靖市| 镇巴县| 长兴县| 申扎县| 炉霍县| 美姑县| 阳朔县| 婺源县| 平山县| 榕江县| 那曲县| 乡宁县| 类乌齐县| 伊川县| 河北区| 东城区| 根河市| 百色市| 衡南县| 民权县| 永善县| 上饶市| 达尔| 南溪县| 赣州市| 新丰县| 乌海市| 稻城县| 诸暨市| 南宁市| 济源市| 界首市| 威宁| 桂阳县| 黑河市|