国产一级一级一级成人毛片,欧美人与性动交α欧美精品,91精品福利在线

Stainless steel decorative pipe control machine

1.StainlesssteeldecorativepipecontrolmachineStainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,productsandhouseholdappliances.Afterthe

1. Stainless steel decorative pipe control machine

Stainless  steel decorative pipe machine is mainly used for the production of  stainless steel pipes and carbon steel pipes for decoration, products  and household appliances. After the moulding of this series of units,  round pipes, square pipes and rectangular pipes can be drawn out. It can  also produce elliptical pipes, semi-circular pipes, plum blossom pipes  and other special-shaped pipes. Such as: stainless steel staircase  handrails, burglar proof doors and windows, electric heating pipes, etc.

2, automated production process:

Through  the continuous forming process of uncoiling, feeding guidance, marking,  forming, welding, external weld grinding, shaping and sizing, sizing,  cutting (coil), jointing, etc., the structure is fine and the operation  is simple.

3. Product  characteristics: the machine is strong, durable, high precision, fully  automated, simple to operate, continuous production, high efficiency,  less waste of materials, high yield, low production cost.

4, technical parameters:

Model

Horizontal(mm)

Vertical (mm)

pipe diameter(mm) 

Tube thickness(mm) 

Motor power

Assembly size L*W(m) 

Specification for decorative pipe control machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.5

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m


Operational considerations:

1, ensure smooth production and meet product requirements.

1.2 effective maintenance of equipment.

1.3,  write reasonable operation instruction procedures to ensure the  production plan and product quality achieve the desired goals.


2, scope of use:

Workshop management department.


3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas or electricity, grinding the wheel, saw blade and cutting  table.


4, boot:

4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.

4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.

4.4  Let the motor run empty for 2-3 minutes before going to work every  morning. The transmission gears are equal to 0. When driving, the  operator is not allowed to leave the machine tool and do other  irrelevant things.

4.5 it is  strictly prohibited to wear gloves to boot, long sleeved clothes must  wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.

4.9  In the process of pipe-making, the cutting strip must be consented by  the workshop director, stored in the belt-laying area, and recorded in  detail with the sling operator on the Production Process Card. It must  not be discarded at will.

4.10  If abnormal phenomena are found in operation, such as smoke, burning  odor, sudden fuse burning, sudden extinguishment of indicator lights and  timely switching off the power switch to be checked out, then turn on  operation after troubleshooting.

4.11  the product's length is checked regularly, not more than 6.01 meters,  not less than 6 meters. Strictly controlled between 4mm. The pipe on the  unloading pipe rack should not exceed 95% of the total capacity, so  that the flat mouth personnel should be lifted in time, otherwise the  operator will be responsible for the damage.


5, downtime:

5.1 stop welding while closing the power supply.


  • <button id="ml04a"></button>
    <li id="ml04a"></li>

    1. <span id="ml04a"></span>
      <rt id="ml04a"></rt>

        <label id="ml04a"></label>
          主站蜘蛛池模板: 山西省| 探索| 抚顺县| 思南县| 连云港市| 稻城县| 呈贡县| 北海市| 林州市| 象州县| 花莲县| 图们市| 蚌埠市| 抚远县| 莲花县| 德惠市| 东源县| 京山县| 瓦房店市| 平陆县| 瑞丽市| 沂水县| 秦皇岛市| 衡南县| 余庆县| 武定县| 平山县| 屏边| 承德市| 台中县| 江达县| 汶川县| 菏泽市| 来凤县| 西丰县| 屯昌县| 长阳| 丘北县| 海晏县| 石楼县| 时尚|