Stainless steel welded pipe equipment

Productrealmap:productdetails1.StainlesssteelindustrialpipemakingmachineStainlesssteelpipemakingmachineismainlyusedformanufacturingstainlesssteelpipes,waterpipes,naturalgas,nuclearpowergenerationpipes

Product real map:


1870651118_753290084

1870651066_753290084
 


product details

1. Stainless steel industrial pipe making machine

Stainless steel pipe making machine is mainly used for manufacturing stainless steel pipes, water pipes, natural gas, nuclear power generation pipes, etc. Because of the maturity of stainless steel welded pipe technology, seamless pipes have been obtained in many fields (such as chemical industry, medicine, distillery, petroleum, food, automobile, paper making, air conditioning, etc.).


2, automated production process:

Through the continuous forming process of uncoiling, feeding guidance, marking, forming, welding, external weld grinding, shaping and sizing, sizing, cutting (coil), jointing, etc., the structure is fine and the operation is simple.

3. Product characteristics: the machine is strong, durable, high precision, fully automated, simple to operate, continuous production, high efficiency, less waste of materials, high yield, low production cost.


4, technical parameters:


Model

(mm)

mm)

(mm) 

(mm) 

power

sizeL*W(m) 


met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.2

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m



Operational considerations:

1, ensure smooth production and meet product requirements.


1.2 effective maintenance of equipment.


1.3, write reasonable operation instruction procedures to ensure the production plan and product quality achieve the desired goals.


2, scope of use:


Workshop management department.


3, rules:


3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.


3.2 accurately control the operation of the machine before shift and coordinate with normal production. Pay attention to the opening of water, gas or electricity, grinding the wheel, saw blade and cutting table.


4, boot:


4 before starting, according to the lubrication requirements, injecting different lubricants to the parts where the lubricating oil is required to be injected.


4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.


4.2 Check whether the mechanical parts and pneumatic system are normal or not. If there are abnormal phenomena, they should be checked and eliminated in time so as not to cause mechanical equipment accidents.


4.3 Check the transmission gear is correct, otherwise there will be quality problems, whether the pressure gauge of the cutting machine reaches 0.5-0.7 mpa, otherwise it can not be cut.


4.4 Let the motor run empty for 2-3 minutes before going to work every morning. The transmission gears are equal to 0. When driving, the operator is not allowed to leave the machine tool and do other irrelevant things.


4.5 it is strictly prohibited to wear gloves to boot, long sleeved clothes must wear hand sleeves, and long hair must wear a hat.


4.6 do not wipe the rotating parts when starting.


4.7 correctly adjust the mold, not vigorously under pressure, in place.


4.8 during the operation, you are not allowed to leave the machine tool. You are not allowed to do other irrelevant things, and pay attention to whether the welds are normal.


4.9 In the process of pipe-making, the cutting strip must be consented by the workshop director, stored in the belt-laying area, and recorded in detail with the sling operator on the Production Process Card. It must not be discarded at will.


4.10 If abnormal phenomena are found in operation, such as smoke, burning odor, sudden fuse burning, sudden extinguishment of indicator lights and timely switching off the power switch to be checked out, then turn on operation after troubleshooting.


4.11 the product's length is checked regularly, not more than 6.01 meters, not less than 6 meters. Strictly controlled between 4mm. The pipe on the unloading pipe rack should not exceed 95% of the total capacity, so that the flat mouth personnel should be lifted in time, otherwise the operator will be responsible for the damage.


5, downtime:


5.1 stop welding while closing the power supply.

3

4

5

6

  • <button id="ml04a"></button>
    <li id="ml04a"></li>

    1. <span id="ml04a"></span>
      <rt id="ml04a"></rt>

        <label id="ml04a"></label>
          主站蜘蛛池模板: 微山县| 弋阳县| 木兰县| 德兴市| 南江县| 华坪县| 云浮市| 阿拉善左旗| 星座| 清原| 灵璧县| 子洲县| 大厂| 珲春市| 锡林郭勒盟| 西吉县| 临洮县| 延长县| 云安县| 通州市| 图们市| 板桥市| 隆尧县| 万山特区| 黔西县| 敖汉旗| 上蔡县| 拉孜县| 新绛县| 茶陵县| 兴文县| 应城市| 东阳市| 新河县| 晋宁县| 抚远县| 绥宁县| 鲁山县| 云浮市| 昌乐县| 宣汉县|